PM Imaging Mgmt., LLC * GE MRI HDxT 16.X 3.0T 16 channel Twin Speed System with LCC
System: GE MRI HDxT 16.X 3.0T 16 channel Twin Speed System with LCC K4 magnet. LHe level 71.35%. Magnet. pressure 1.511 psi. Sumitomo F-50 compressor. Cold head RDK-408. HP Z400 computer with HD16.0_V03. Software. INFO CD on site. MGD chassis with 16 channel receivers. Sunfire X4100 M2 ICN. 35KW ASTEX RF
Amp, Compact PDU and 8916 HFD gradient 33mT/m SR80/SR150.
Options installed:
Software Options Installed : Echo Planner Imaging, Fast Gradient Echo, Cine, Fast Spin Echo & FLAIR, Time of Flight, Phase Contrast Vascular Imaging, Research, Research PSD, Spectroscopy/PROBE, SGD_EchoSpeed, DW EPI, FLAIR EPI, SPECIAL, Smart Prep, SSFSE, Three Plane Localizer, Modality Worklist, E3DTOF, FSE_XL, Bloodsupp, Fastcine, Sgdperf, iDrive Pro, iDrive, SmartPrep 2000 Upgrade, Functool 2, Voxtool, Interactive Vascular Imaging, Clariview, Spectro Analysis GE, Performed Procedure Step, iDrive Pro Plus, Ultrashort TR, T2 Breathhold, SSFSE MRCP, T1 Breathhold, ACGD PLUS, Fluoro-triggered MRA, MRCP3, Fiesta 2D, Fiesta 3D, Asset, Diffusion Tensor, 3DFRFSE, Asset Plus, TRICKS, FIESTA-c, BREAST2, Propeller DWI, 3D Fat Sat FIESTA, Brainwave RT, Brainwave PA, Propeller T2, 16 Channel System, Lava, FiberTrak, FLAIR3D, Multi-Phase (variable delays), Blood Flow and Volume Measurement, 2D MERGE, LAVA-XV, BRAVO, COSMIC, Integrated Patient Comfort Module, Brainwave Fusion, HDx kay, IDEAL, 3D Dual Echo, ARC, Cube T2, T2Star Weighted Angiography, Inhance 2D Inflow, Inhance 3D Velocity and Inhance 3D Inflow IR.
Coils: Quad body, Quad split head, Quad knee/ankle (chimney), 16 ch HNS, 8 ch CTL, 8 ch NV array, 8 ch HD brain, 8 ch torso array, 8 ch breast array (biopsy ready), 4 ch neurovascular, 3 ch shoulder, 3 ch wrist and GP flex
PM Imaging Mgmt., LLC will not be responsible for any licensing agreements/transferring of OEM software, non-transferable software or missing manuals originally sent with the system.
Located in Southeastern ** Pending inspection ** AS Is Where is $185K OBO
Available Date: Approx. May 15, 2023 Ramp down Removal May 15- 19, 2023
Kevin Collins, Managing Director, 213-276-8209